Unit C1, Great Bridge Industrial Estate, Tipton DY4 0HR · Installing across England and Wales
Steel fabricators for Birmingham and the West Midlands. We design and fabricate staircases, balustrades, walkways and structural steelwork using 3D Advance Steel, then install them across England and Wales with CSCS- and IPAF-accredited teams.
Installation teams
Powered access
Public & products liability
Bespoke steelwork for architects, facilities managers, care homes, factories and industrial sites, made to your drawings or ours.
Straight, dog-leg, spiral, and fire-escape staircases, designed around your drawings and site survey.
Glass, stainless-steel, mild-steel and mesh balustrades for stairs, landings, mezzanines and roof edges.
Galvanised external fire escape stairs for commercial buildings, designed to Parts B and K.
Steel walkways, platforms and gantries with open-mesh flooring, handrails and toe boards.
Commercial gates, perimeter railings and security fencing for industrial, school and care sites.
Structural and secondary steelwork, with on-site welding and installation by our own CSCS teams.
We measure on site or work from your architect’s and engineer’s drawings.
Fabrication drawings are issued for your approval before anything is cut.
Cut, welded and assembled in our Tipton workshop.
Galvanised, powder-coated, or primed to your specification.
Installed by our CSCS- and IPAF-accredited teams, then handed over for sign-off.
| Standard | Applies to |
|---|---|
| Approved Document K Protection from falling | Stairs, balustrades, balconies |
| Approved Document M Access to and use of buildings | Stairs, handrails |
| Approved Document B Fire safety | Fire escape stairs |
| BS 6180 Barriers in and about buildings | Balustrades, handrails and guarding |
| BS EN ISO 14122 Permanent means of access | Walkways, gantries, platforms |
| BS EN ISO 1461 Hot-dip galvanised coatings | Galvanised finishes |
| BS EN 13438 Powder coatings on galvanised steel | Powder coating over hot-dip galvanising (duplex) |
| BS EN ISO 12944 Corrosion protection by paint and powder systems | Powder coating on mill-finish steel |
Typically 6–8 weeks from drawing approval. We’ll confirm your programme with the quotation and align with your site dates.
Yes. Send PDF, DWG or DXF files, and we’ll produce fabrication drawings for your approval.
No problem. We can carry out a site survey to take measurements and define your requirements. A survey fee applies, which we’ll confirm when you book. Once the survey is complete, we’ll send your priced quotation, and 3D Advance Steel drawings are issued for your approval before fabrication.
Yes. Before we start on site, you’ll receive RAMS, a construction phase plan, our insurance certificates, and CSCS and IPAF card details for the installation team.
Yes. We arrange all the lifting and access equipment for the job. We bring our own certified lifting equipment, and any hired-in equipment arrives certified and ready for use, so you don’t need to provide anything.
£10m Public & Products Liability, plus Employer’s Liability. Certificates on request.
Yes. We regularly install in working factories, occupied care homes and offices, planning noisy work and access around your operation.
We’re based in Tipton, West Midlands, and we install across England and Wales.
Tell us about the project and attach any drawings. We’ll send a quotation within 3 working days.
Send us photos for a quote
Take a few photos of your project and note the address. Tap the button below, WhatsApp will open, then attach your photos and press send.
Open WhatsAppPrefer email? Send photos to info@q-fabs.co.uk